Satisfaction Ratings

Clients Give USCCG High Marks

USCCG Client Satisfaction Ratings (Through 05/06/08)

Overall Satisfaction 95.6 percent of USCCG clients expressed overall satisfaction with the firm with 82.6 percent saying they were “extremely” or “very” satisfied.

Case Histories

Containerboard manufacturer needed to reduce costs and improve on-time delivery.

SEE MORE CASE HISTORIES

Testimonials

"The company and USC Consulting Group implemented a system for setting up new jobs in the press department that has resulted in a reduction of set-up time of more than 30 %." – Printing and Packaging Conglomerate

SEE MORE TESTIMONIALS

Press Room: Library Of Articles

Climbing The Ladder To World Class Maintenance Status By Joe DiNapoli, Dean Carrier and David Shouldice

A world class maintenance operation differs from a run-of-the-mill operation only by the degree to which it achieves its primary function: to ensure that the right amount of equipment is ready and available without costing the operation an arm and a leg. An automobile runs most efficiently - with better gas mileage, fewer breakdowns, a smoother ride -- when it is well tuned and maintained. The same holds true with mining and quarrying equipment.

Quality maintenance practices keep mining and quarrying operations running smoothly and profitably. Poor practices can bring productivity to a halt and seriously affect the bottom line, as well as frustrate everyone on the site.

"As a general rule, I think most companies could do a much better job of measuring maintenance," says Dean Carrier, operations manager with USC Consulting Group. "A standard measurement in any operation is to look at the volume of product produced per direct labor hour utilized, but there seems to be a firm belief among maintenance organizations that this can't be done."

He says that maintenance staff frequently evaluate their productivity based on which specific employee does the work. This is a far cry from how the production side usually works claims Carrier. "Production people say it doesn't matter who mans the machine center and it doesn't matter who drives the truck. They still expect a specific amount of tonnage to move during a shift."

Maintenance organizations, on the other hand, tend to believe that a certain amount of work will get done by noon if the job is assigned to Joe Smith, but, if Bill Jones gets the assignment, the work won't be done until next Tuesday.

"Maintenance organizations tend to start off with metrics that lack detail," says Carrier. "They have few historical measurements, so they can't really focus on what needs to be improved."

Building Best Practices
Carrier cites five key components for attaining world class maintenance status as defined by Terry Wireman, author of World Class Maintenance:

    • Quality equipment maintenance;
    • A positive attitude toward preventive maintenance (PM);
    • Labor planning;
    • Inventory control; and
    • Using automation in the field to optimize the maintenance department's ability to meet its goals.

Each of these areas must be tracked closely with clearly defined metrics that allow for quick problem spotting and even quicker resolution. That means looking at basics, like costs, availability, reliability, overall practices, and how personnel are used.

"Inventory and inventory dollars are critical here," says Carrier. "For example, it's extremely important to take a long hard look at critical spares and non-critical spares. What are we actually spending and buying? What's in the warehouse?

"Consumable supplies - any piece of equipment that ultimately gets thrown away, like tires, oil filters or batteries - can eat up more money than you realize. At one mining location, tires for pick-up trucks were running about $115 apiece and they were using about 200 tires a year," Carrier reports.

"After a few phone calls, we were able to locate a different supplier, about a hundred miles away, who was willing to deliver the tires to the mining site for about $75 each. That meant savings of $8,000 every year. Those seemingly 'little' numbers," he says, "add up pretty quickly."
Planning also plays a big role in world class maintenance practices. Every operation has a master plan, but how effective is it?

"If you go into any operation and ask if they have a production plan or a capacity plan," says Dave Shouldice, USC senior operations manager, "the answer is always 'yes.' If you ask them if it's the right plan, they always say 'yes.'"

If that's the case, what's holding back some of North America's best mining and quarrying organizations from reaching world class status?

Carrier says that most are experiencing at least some of the same recurring problems, among them:

    • Computerized maintenance management systems that don't deliver expected benefits;
    • Allowing production to constantly change daily maintenance plans;
    • Lacking connection between production and maintenance resource capacity planning;
    • Overrunning planned shutdown times on equipment;
    • Mismanaging outside contractors,
    • Overlooking work order disciplines,
    • Poorly defined labor productivity; and
    • Stagnant or increasing maintenance cost-per-ton.

These problems stem from a number of common mistakes that Carrier and his USC colleagues see on a fairly routine basis. In many cases, work orders are not estimated for labor hours, trade skill and parts requirements. Often the orders are issued without the proper materials on hand. This slows maintenance to a crawl and creates a backlog of maintenance orders that can run more than six months behind. This situation causes a loss of faith in the system and results in the system not being used at all!

Maintenance shutdown plans are not made against a timeline, so that down time is often far longer than anticipated. Even then, shutdown postmortems are rarely, if ever, conducted to determine the causes for the delays. And, frequently, employees and supervisors are not trained to drive to the root cause of problems, so that Band-Aid solutions become the accepted norm. This is the number one source of friction between maintenance and operations.

Preventive maintenance routines are seldom reviewed, a practice USC recommends be done at least once a year. Records are not centralized or easily accessible, so that predictive maintenance practices are difficult to develop.

Carrier illustrates how much money can be saved through quality maintenance practices with this example. At one open pit coal mine, management wanted to increase throughput to meet demand. They believed this was the easiest way to reduce unit cost, particularly since the downstream capacity was available. They thought the best way to facilitate this plan was to purchase a number of 200-ton haul trucks at a significant capital investment. They didn't see any way to move more overburden or coal with their existing equipment. Every piece of equipment on site, with the exception of those in the pit maintenance shop, was operating twenty-four hours a day, seven days a week.

When USC was called in to assess the opportunities for increasing throughput, they started with the maintenance function and the availability of haul trucks. In their evaluation of the preventive maintenance program, they learned that it typically took thirty hours from the time a truck showed up at the garage until the time it went back into service. Working with the employees and supervisors, USC used their Process Mapping expertise to determine the actual work content, as well as sources of delays and other non-value adding activities. Then an Employee Involvement Prototype was used to determine the best sequencing of activities and parts delivery to minimize the time required to put the equipment back into the pit. Standard procedures, metrics and a problem identification and resolution process were developed and documented, resulting in a reduction of ten hours in the time required to turn around a haul truck.

Unscheduled breakdowns were addressed next. An unscheduled breakdown is caused by one of two issues: fatigue (the part wore out) or stress (the part was improperly maintained or abused). Carrier says it normally takes twenty percent less time to do a repair job that is planned versus completing an unplanned breakdown job.

While emergency repairs can probably never be eliminated, they can be minimized. The key is to create a method for analyzing what is failing, why it is failing and how to avoid the failure. One way to accomplish this is to implement Mean Time Between Failure as a key metric in the maintenance operation. This requires a good equipment history documenting what was repaired and tracking how long the part had been in operation before failure.

Using a Pareto Chart as a tool, each type of equipment can be analyzed to determine which part is causing unscheduled repairs. Following up with a root cause analysis will help to determine if the operation should:

    • Go to predictive maintenance (change out after a set number of hours of operation),
    • Choose a different supplier for longer part life,
    • Change the PM program or,
    • In some cases, change such operating procedures as grading the haul roads more frequently.

In this particular case, USC was able to extend the amount of time the haul trucks could be used by about ten percent before they experienced an unscheduled failure. Multiply that ten percent by the number of trucks in the fleet and the savings are significant.

The upshot at this mining operation was that with improved equipment availability, there was no need to purchase more haul trucks to meet improved throughput goals. From a capital expenditure perspective, the company saved hundreds of thousands of dollars. In addition, production and labor cost savings ran upwards of $2 million annually, year in and year out.

The Big Picture
"You can't look at the maintenance process in isolation and expect to attain world class status," explains Joe DiNapoli, USC senior operations manager. "You have to look at the grand scope and involve people from every part of the operation and at every level. There are certain things that need to be done and certain changes that need to take place within the production group or the operations group, for example, that can facilitate what's being done in maintenance," he says.

In an open pit, a truck can suffer a lot of abuse as a result of the quality of the roads they drive over. The roads are usually maintained by the operating group and are far from highway driving quality. They are very bumpy and rough. The wear and tear on the trucks can be devastating to production. Just re-grading the roadbeds on a regular basis can extend truck life enormously and it goes a long way toward reducing the amount of time trucks spend in maintenance.

Dave Shouldice cites another example. "A zinc ore mine in the Yukon was having big problems with maintenance. We spent a lot of time getting detailed input from the maintenance group and comparing it with the master mine plan. It soon became obvious that they didn't have the right mix of equipment. They were over-shoveled and over-trucked. And they were short on D10Ns with ripper blades and graders, both of which support the shovels."

By taking the maintenance group's information, which detailed recurring problems with the hard toes on shovels that were constantly hitting benches, and unusually frequent breakdowns on drills, haul trucks and banjos, it became evident that the blasting pattern was creating the worst maintenance issues.

"Multiple small blasts were being done. This pushed them into a vicious cycle of repeated equipment pullbacks that were putting a lot more mileage and stress on this massive equipment than normal. The result was continual production slowdown and horrendous maintenance costs," says Shouldice.

By bringing together the different operational and maintenance elements and analyzing the information to determine the root causes for the problems, USC was able to develop a new capacity plan. It gave the mine the right mix of equipment to support the operation and a better schedule for larger blasting sizes and patterns to reduce excessive equipment movement. It was a big step toward world class maintenance practices for this mine.

Climbing the World Class Ladder:
Step One - Determine Where You Stand Today
The first rung on the ladder to world class status requires mining companies to determine where they stand today against world class maintenance principals. This entails three simultaneous actions. The first is to perform an in-depth survey in all key areas, including:

    • Maintenance organization,
    • Training programs,
    • Work order system,
    • Planning and scheduling,
    • Preventive maintenance,
    • Inventory and purchasing
    • Reporting, and
    • Automation.

In the second action, develop a pictorial overview of the current flow of maintenance information. This requires involving every employee in a review of his role in the maintenance process and putting every activity into a schematic diagram. Focus on "the life cycle of a work order" and what metrics are currently used to determine the effectiveness of the department and the interactions with other departments.

Finally, do a series of task observations to learn what actually impedes the ability of the maintenance people to accomplish their daily assignments. Spend full shifts with the tradesmen to see the operation from their eyes. Document and graph the percentages of their day spent adding value, performing non-value added tasks or idly waiting for something to happen. "It is not unusual to find that value added time is well below fifty percent of a tradesmen's day."

"This first step is one of the toughest for any manager," says Carrier. "Each and every day he says he's going to go in and make a difference. Then the realities of the day strike him in the face and he never has time to come up for air, let alone tackle some of those big issues that are so important. This is why companies like USC can help jump-start the process. We have the tools and the knowledge to come into any mining or quarrying situation and get the ball rolling."

Step Two - Create a Vision for the Future
The second step calls for a company to create a vision for the future. By using the results from the first series of assessments, a vision that speaks to both maintenance and production can be designed and communicated throughout the operation. The vision doesn't have to be detailed; let the people fill in the blanks. But it must show a firm commitment on the part of the site's senior management team to do things differently to make the operation more effective.

"You simply cannot build a world class maintenance operation in isolation," reiterates DiNapoli. "It requires the active involvement and support of every other group on the site and it requires a serious commitment from top management."

Step Three - Involve Employees in the Change Process Through Prototyping
This is where the catalysts for success are generated: Develop a system through employee involvement. "Pulling in every employee and involving each one in developing a better system is the key to world class success," DiNapoli points out.

Carrier adds, "There's always some resistance to this approach. Many employees will say, 'Heard it all before.' But once they are presented with hard facts and a new system that they've helped devise to make their lives easier and their work better, they accept the validity of the approach.

Use an Employee Involvement Prototyping process to engineer change and achieve buy-in. Do this by choosing one shutdown, one work group, or one tradesperson to develop and prototype methods of planning and scheduling, controlling, reporting, and improving the operation to meet the challenges laid out in Step Two. The key to success here is a daily review meeting, attended and chaired by the senior management team. Their role is to demonstrate solid support during the transition process and to answer five basic questions at every review meeting:

    • What did you learn?
    • What did you like and dislike?
    • What do you want to change?
    • Who will be responsible for making the change happen?
    • When will it be done?

Step Four -Roll Out Successes Across the Organization

Roll out the new changes across the entire organization. This can be done very effectively by promoting the success of the prototype. Also, by developing a complete management system around the prototype, buy-in is more quickly achieved.

Avoid the temptation to try and implement the changes across each work group (foreman and his crew) simultaneously. This is very difficult to control and can put the success of the change process at risk. A supervisor and his crew are a natural grouping for implementation. Roll out the changes starting with the work groups most open to change and proceed to those most resistant, and use the lessons learned from each previous implementation. This will help the employees identify with the value of the changes.

Don't be shocked if early in the establishment of the new systems maintenance costs increase. This is only a temporary state that shows up because more materials are being consumed. It will right itself as the practices come into balance and the processes are streamlined.

And find a reason to celebrate each successful installation. This further fosters employee buy-in and their long-term commitment to the changes.

Step Five - Avoid Backsliding Through Quarterly Systems Audits
Once these changes have been implemented, they must be maintained through a continuous commitment to the rigors of the new system. That means keeping the same discipline and focus that was used when designing the new systems. The natural human tendency is toward slippage, so it is very important to avoid complacency.

Use an audit to measure compliance and identify backsliding. World class performance is a never-ending journey and it's easy to lose the way when you stop paying attention to the system. To stay on the path, develop a System Audit and use it on a quarterly basis. The audit is crucial in determining the level of adherence to the system rigors and to alert management if further changes are required as a result of changes to the process. USC recommends the system pieces and disciplines be incorporated into existing quality management systems like ISO certification.

Step Six - Automate the System
Automate, automate, automate, but don't expect automation alone to lead to improvement.
"The difficulty in starting with automation," Carrier advises, "is that it doesn't fundamentally change anything that is already being done, so, ultimately, you'll get the same results a lot faster. Labor productivity won't change just because work orders are in a database versus in a filing cabinet. Inventory turns won't increase - or stock-outs decrease - unless the procedures and rules for purchasing and inventory control are changed."
In one open pit coal mining operation, an automated maintenance system was put in place in the hope that it would improve the maintenance department's productivity by twenty or thirty percent. When USC came on to the scene a year later, they compared the current maintenance performance characteristics to where the operation had been a year before. They looked at such items as the Mean Time Between Failure, labor productivity (actual hours worked versus estimated hours on the work orders) and meeting maintenance schedules. None of the numbers had changed with the introduction of automation. The operation now had lots of reports available for analysis, but management either didn't believe the numbers they produced or the reports were not particularly user friendly. After talking with a number of mechanical and electrical people in the shops, USC learned that everyone knew what was available from the warehouse, but nothing in the system had changed to help get the parts from the warehouse to where they were needed.

"Basically, nothing had been done to change the culture of the operation from a reactive emergency fire fighting organization to a preventive or predictive one," reports Carrier. "Without careful analysis of the various activities required to complete a maintenance task, identifying causes of failures or making adjustments to routing, automation brought nothing to the party."

The key to making automation really work is to change the process and the culture first, then automate it to make the process easier to manage. And take the time to look for the best fit. An automated system that works miracles in one situation may not necessarily be the best solution for another one.

Rank Your Company Against World Class Practices

1. Plan for preventive and predictive maintenance. Sometimes predicting when parts will need replacing is more cost effective than continually trying to keep them going through preventive maintenance practices.

2. Define the mean time between failures and mean repair time. Time is money, as always, and this will give you back some of each.

3. Focus on task, labor and material planning. Make certain that the task has been assigned to the right person with the right skills, that the person is available to perform the task and that the required materials are on hand when they are needed. This reduces "wait around" time.

4. Maintain work coordination and control. Keep the process moving by defining tasks and assignments, keeping an eye on the time and costs involved for quality project completion.

5. Identify problems for quick resolution. Recognizing the problem is the biggest step toward a solution. Focus on the biggest cost issue and resolve it before moving on.

6. Continue to improve every step of every process every day. Review records frequently to determine whether processes are slipping on costs, labor time or quality.

7. Record information on such items as time, cost, labor hours, availability of parts, skill requirements.

You can rank your mining or quarrying operation against world class practices and your competition by contacting USC for its World Class Comparative Diagnostic audit. It's available, free of charge on computer disc in Excel format. Simply answer the questions and return the disc to USC to receive a report showing how your company ranks. All information provided will be kept completely confidential.

To receive your audit, contact USC Executive Vice President Jack Korpela at 905-673-2600.


Author Bios:

Joe DiNapoli is vice president, senior operations manager at USC Consulting Group. His experience spans more than twenty years with the firm, during which time he has supervised a number of large mining maintenance projects. He has been instrumental in introducing the techniques of the Lean Production System into assorted mining operations, with special emphasis on the synchronization of processes. In 1991 he was awarded the USC's highest honor, the Creativity and Innovation Award, for his exemplary efforts to develop positive approaches between management and unions. DiNapoli has earned APICS certification and was degreed in Lean at the University of Kentucky.

Dave Shouldice joined USC in 1986 and is a vice president, senior operations manager. He has worked with a number of different industries throughout North America and Asia in such system disciplines as TQM, Lean, Six Sigma, Supply Chain Management and TPM. His special areas of expertise include supply chain management, engineering and management systems and chemical process management. He is a graduate of the Laurier University Honors Business and Economics Program.

Dean Carrier is currently operations manager with USC Consulting Group. During his 14 years with the firm, he has worked on numerous mining projects, including production, maintenance, milling and engineering. He also has extensive experience with USC in the pulp and paper, food processing, and transportation industries. Carrier holds a BSc in Chemical Engineering from the University of New Brunswick in 1981. He is also certified in Production and Inventory Management from APICS (American Production and Inventory Control Society).

 

Back to Press Releases